Ville de Libercourt (62)
12 ha - In progress
Requalification of the city center and an industrial wasteland
Project Management
Egis Ville & Transports, Atelier KVDS, Urbania

Orchies. Ville d’Orchies (59)
3 000 m² - 2023
Renovation of the former Leroux offices into a cultural complex / BBC
Design-Realization Project Management
Face B

Intech, Rang-du-Fliers (62)
11 000 m2 - 2022
Development of a factory with production workshops and head office of the direction in conception realization
Ramery, Coast Architecture
Foreword

Stam Europe, Paris 8
26 apartments - In progress
Rehabilitation of an apartment building to optimize the surface area in line with the Parisian rental market
Feasibility study and Project Management
Calq

EPSM de Lillers, Pas-de-Calais (62)
2021
Requalification of the EPSM building
Programming and consulting organization

Nauticaa. Ville de Liévin (62)
7 000 m² - 2021
Restructuring of the Nauticaa Aquatic Center / BBC & RT2012
Design-Realization Project Management
Atelier Le 212

Ville d’Annay-sous-Lens (62)
2 000 m² - 2021
Construction of a positive energy gym (BEPOS)
Design-Realization Project Management
Guede-Monai-Architectes

Ville de Thumeries (59)
1 500 m² - 2021
Construction of a cultural complex: Mediatheque and Restaurant / RT 2012-20%
Design-Realization Project Management

VERSION MOBILE ET TABLETTE
Ville de Libercourt (62)
12 ha - In progress
Requalification of the city center and an industrial wasteland
Project Management
Egis Ville & Transports, Atelier KVDS, Urbania

Orchies. Ville d’Orchies (59)
3 000 m² - 2023
Renovation of the former Leroux offices into a cultural complex / BBC
Design-Realization Project Management
Face B

Intech, Rang-du-Fliers (62)
11 000 m2 - 2022
Development of a factory with production workshops and head office of the direction in conception realization
Ramery, Coast Architecture
Foreword

Stam Europe, Paris 8
26 apartments - In progress
Rehabilitation of an apartment building to optimize the surface area in line with the Parisian rental market
Feasibility study and Project Management
Calq

EPSM de Lillers, Pas-de-Calais (62)
2021
Requalification of the EPSM building
Programming and consulting organization

Nauticaa. Ville de Liévin (62)
7 000 m² - 2021
Restructuring of the Nauticaa Aquatic Center / BBC & RT2012
Design-Realization Project Management
Atelier Le 212

Ville d’Annay-sous-Lens (62)
2 000 m² - 2021
Construction of a positive energy gym (BEPOS)
Design-Realization Project Management
Guede-Monai-Architectes

Ville de Thumeries (59)
1 500 m² - 2021
Construction of a cultural complex: Mediatheque and Restaurant / RT 2012-20%
Design-Realization Project Management